top of page

Power Pack - Tunnelling 

Industry

Based on the customers requirement and demands we can create the perfect power pack for your application. The specification required for this particular power pack was to provide enough hydraulic power to operate one of the drilling and grouting rig units for the tunnelling industry, specifically to be used in the construction of HS2.

All of our bespoke power packs are first produced within CAD with full stress analysis before being manufactured in our Doncaster based workshop.

For further information and a sale/hire quote do not hesitate to contact one of our technical experts today:

bottom of page